INSTALLATION
INSTALLATION
AngelEye systems can be installed
in any type of pool.
The implementation of AngelEye systems is applicable to all types of public and private swimming pools both existing and in construction, in concrete, steel and other construction variants. The operation typically takes place in 4 main phases: design study, preparation for installation, hardware installation, configuration and testing.
Design study
Ready for installation
Hardware installation
Configuration and testing
Design study
The design phase of the system is carried out by AngelEye’s technical office, which handles the plans and descriptive reports of the system. The design study phase is realized with the production of plans showing the location of all the system components and a technical document containing all the specifications for the preparation and installation phases.
Ready for installation
This phase prepares all the conditions for the installation of the AngelEye system. If underwater detection devices are to be used, the pools must be equipped with niches that will house the cameras. Electrical and data wiring will allow all system components to be connected. The installation can be carried out by AngelEye personnel or certified partners or companies selected by the customer under the supervision of AngelEye experts.
Hardware installation
The installation of AngelEye components can take place in a single phase for existing systems or in different stages of design progress for newly built systems. The activities are carried out by AngelEye technicians or certified partners.
Configuration and testing
The configuration phase is carried out by AngelEye personnel remotely and at the swimming pool where the test and testing phases are carried out. Adequate training of the system is given to the security staff with the issue of a certificate. If the application of the norma ISO 20380:2017 standard is required, tests are carried out and appropriate documentation is issued as defined by the standard itself.